首页 期刊 东北水利水电 Study on joint optimization operation scheme forPangduo reservoir and Zhikong reservoir 【正文】

Study on joint optimization operation scheme forPangduo reservoir and Zhikong reservoir

作者:WANG; Qiang
reservoir   operation   cascade   reservoirs   joint  

摘要:The cascade hydropower system composed of Pangduo reservoir and Zhikong reservoir are formed on the middlereach of the main Lasahe river. For giving full play of joint compensation effect of the two reservoirs, the paper studied the joint operationscheme for Pangduo reservoir and Zhikong reservoir. Based on the respective operation scheme, a reservoir group joint operationmodel is built, the model is solved by the simulation- optimization method, and then the practical and operational scheme isachieved. The scheme could give full play of the joint regulation and storage effect of the reservoir group and improve effectivelythe utilization factor of hydropower resources.

注:因版权方要求,不能公开全文,如需全文,请咨询杂志社

学术咨询 免费咨询 杂志订阅