首页 期刊 中国海洋大学学报·自然科学版 Pre-Drilling Prediction Techniques on the High-Temperature High-Pressure Hydrocarbon Reservoirs Offshore Hainan Island,China 【正文】

Pre-Drilling Prediction Techniques on the High-Temperature High-Pressure Hydrocarbon Reservoirs Offshore Hainan Island,China

作者:ZHANG; Hanyu; LIU; Huaishan; WU; Shiguo; SUN; Jin; YANG; Chaoqun; XIE; Yangbing; CHEN; Chuanxu; GAO; Jinwei; WANG; Jiliang Laboratory; of; Marine; Geophysics; and; Georesource; Institute; of; Deep-Sea; Science; and; Engineering; Chinese; Academy; of; Science; Sanya; 572000; China; Key; Laboratory; of; Submarine; Geosciences; and; Prospecting; Techniques; Ministry; of; Education; Ocean; University; of; China; Qingdao; 266100; China; Laboratory; for; Marine; Geology; Qingdao; National; Laboratory; for; Marine; Science; and; Technology; Qingdao; 266061; China; Shenzhen; Branch; of; CNOOC; Shenzhen; 518000; China; College; of; Earth; Sciences; University; of; Chinese; Academy; of; Sciences; Beijing; 100049; China
prediction   techniques   formation   pore   pressure  

摘要:Decreasing the risks and geohazards associated with drilling engineering in high-temperature high-pressure(HTHP)geologic settings begins with the implementation of pre-drilling prediction techniques(PPTs).To improve the accuracy of geopressure prediction in HTHP hydrocarbon reservoirs offshore Hainan Island,we made a comprehensive summary of current PPTs to identify existing problems and challenges by analyzing the global distribution of HTHP hydrocarbon reservoirs,the research status of PPTs,and the geologic setting and its HTHP formation mechanism.Our research results indicate that the HTHP formation mechanism in the study area is caused by multiple factors,including rapid loading,diapir intrusions,hydrocarbon generation,and the thermal expansion of pore fluids.Due to this multi-factor interaction,a cloud of HTHP hydrocarbon reservoirs has developed in the Ying-Qiong Basin,but only traditional PPTs have been implemented,based on the assumption of conditions that do not conform to the actual geologic environment,e.g.,Bellotti’s law and Eaton’s law.In this paper,we focus on these issues,identify some challenges and solutions,and call for further PPT research to address the drawbacks of previous works and meet the challenges associated with the deepwater technology gap.In this way,we hope to contribute to the improved accuracy of geopressure prediction prior to drilling and provide support for future HTHP drilling offshore Hainan Island.

注:因版权方要求,不能公开全文,如需全文,请咨询杂志社

学术咨询 免费咨询 杂志订阅